Studies, Consulting, F&E

Desmet Ballestra (AT, 2008): Continuous test with stillage at pilot scale (ENBAFERM Pilot Container)

Verbio AG (GER, 2008/09): Continuous test with stillage at pilot scale (ENBAFERM Pilot Container)

Hartberg (AT, 2008): Continuous tests of Waste Water Treatment of AD Digestate at pilot scale (ENBAAIR Pilot Container)

Häusle GmbH, Anaerobic Digestion Plant (AT, 2008): Technical Concept & Feasibility Study; Waste to Energy

Biorefinery Ireland Ltd. (GB, 2008): Waste to Energy-Feasibility study of an AD Plant

Lokale Energie Agentur Oststeiermark (AT, 2008): Feasibility of Digestate Treatment

Abwasserverband Bezirk Jennersdorf (AT, 2008): Feasibility study of Co-Digestion

OÖ Bioraffinerie (AT, 2008): Engineering Pilot plant Membrane-separation, Engineering Pilot Plant Ion Exchanger

Das enbasys Team hat über 10 Jahre Erfahrung hinsichtlich ...

» mehr






enbasys gmbh      Parkring 18, 8074 Grambach/Graz, Austria      +43(0)316 - 4009 - 5600      office(at)enbasys.com   |  Webdesign NO SUN